We don't have a crane to do the heavy lifting but we do have a lot of strong backs and willing hands. The guys were moving the high-tension poles up onto the road - one foot at at time. Took a little while but they got the job done. There are forty of the poles.
Another crew moved concrete rings down into a ravine to form a culvert. This is a ravine next to the turbine house and has a small stream at the bottom. They lowered the rings with ropes one at a time then rolled them into place. We will back fill over the rings making a bridge that our equipment can pass over to work on the penstock route.