Friday, December 4, 2020

Intake dam is complete

The intake dam is complete and the lake is full.  We have flushed out a lot of debris
so the water is clean.
This is the back side of the dam with water flowing through the spillway

The pipe welders are at work joining the 6 M pipes together.  The 12 M lengths 
will be moved into the penstock trench and welded together.  

We are preparing 1 M sections of conduit that will be installed in a trench that 
allows us to move water from the diversion dam into the front water shed
where it will flow into into the intake dam lake.  