The intake dam is complete and the lake is full. We have flushed out a lot of debris so the water is clean.
This is the back side of the dam with water flowing through the spillway
The pipe welders are at work joining the 6 M pipes together. The 12 M lengths will be moved into the penstock trench and welded together.
We are preparing 1 M sections of conduit that will be installed in a trench that allows us to move water from the diversion dam into the front water shed where it will flow into into the intake dam lake.