The intake dam is nearing completion. A top cap concrete is most of what remains. |
Back side of the dam. |
This is how we generally get work done here. |
Lifting penstock pipe is much easier with the Bobcat |
Turbine house is nearly completed. Waiting for the big diesel generator to be installed. |